Suspended Access Scaffold at the High Level Bridge, Newcastle

Core Services
Scaffold Design and Engineering
Service Aspects
Suspended Access and Protection Decks
Industry
Rail

RDG designed a suspended access scaffold to enable essential repairs and restoration work to the underside of six spans of the High Level Bridge in Newcastle. To prevent overloading the outer arch, the design focused on concentrating the load on the main inner arch. This was achieved by installing 750mm deep beams above the pavement, supported by timber packers at specified intervals. Droppers were then installed through pre-drilled holes in the bridge deck to support the suspended scaffold below, ensuring safe and efficient access for the restoration works.

Close up of scaffold providing access to underside of bridge.
Close up on dropper arrangement.
Train passing over bridge while scaffold is present.